Top 5 Zwift Videos: Wheel Seeking, Running, and Single Speed Zwifting

Top 5 Zwift Videos: Wheel Seeking, Running, and Single Speed Zwifting

This week’s Top 5 Zwift Videos include persistent efforts to get some Lightweight wheels, tips for beginner Zwift runners and cyclists, advice for super-short races, and a guide for Zwifting on a single-speed bike.

Winning The Zwift Meilenstein Wheels…all the fails then. Boom!

To get one of the best climbing wheelsets in the game, you have to climb the Alpe du Zwift and spin a prize wheel. Black British Cyclist Kendizle hilariously documented his many summits of the Alpe while trying to earn the Lightweight Meilensteins. He even made some music out of the failed attempts.

How to Run Inside on Zwift

If running is more your thing, Fat Boys in Lycra have created a useful introduction to Zwifting on a treadmill. Check it out!

Top 5 Zwift Tips for Beginners

Josh Weight (The Vegan Triathlete) has some beginner tips that aren’t just about how to use Zwift. They also include ways to make your indoor rides more enjoyable.

How to Win a Zwift Sprint Race // Category C Zwift Racing // Innsbruck

Before you join a short race (sometimes called a “sprint” race), check out these tips from Caedmon Cycling.

Single Speed / Fixed gear bike on a Smart trainer or Zwift

There are a few things to consider before trying to use a single-speed or fixed-gear bike on Zwift, and “silver_rocket” can walk you through them.

Got a Great Zwift Video?

Share the link below and we may feature it in an upcoming post!

About The Author

Karissa Minn

Karissa is a freelance writer and cycling enthusiast. She also volunteers and serves as an advisor for a community bike center called The Pedal Factory. She and her husband, an avid cyclist, live in North Carolina with their two birds, who have not yet learned how to ride a bike.

Subscribe
Notify of
guest
6 Comments
oldest
newest most voted
Inline Feedbacks
View all comments
Scott
Scott
1 month ago

been waiting for the zwift run pod to be in stock for over 5 months.

dan
dan
1 month ago
Reply to  Scott

garmin pod works same

MHolden
MHolden (@holdenadventures)
1 month ago
Reply to  Scott

Man that stinks! They seem to be in ready stock in Thailand from Lazada.

Thiago
Thiago
1 month ago

I got the lightweight Meilenstein in the 5th try.

Jeff Kryvicky
Jeff Kryvicky
1 month ago

7 tries on the Alpe so far. Mostly gloves, gloves gloves 😀 Half way to the tron though…

Ken L xpd
Ken L xpd (@kenichiro7)
1 month ago

The link for tips on riding a single-speed in Zwift appears to be an error and has nothing to do with single-speed riding. It is actually a video about some guy’s recent race experience. I did find, “silver-rocket’s,” video on youtube. Contrary to his claim, you can free ride on a fixed gear in Zwift if you have a real power meter like a Stages crank or Garmin Rally pedals, which don’t require a roll down calibration like most trainers. A wheel-on trainer is required, but Zwift can still control grade resistance with smart trainers like the Kicker Snap and… Read more »

Free Zwift Trial

Newsletter Subscription

6
0
Would love your thoughts, please comment.x
()
x